Our projects: Metallurgy

Novosibirsk Electrode Plant

Novosibirsk Electrode Plant

From October 3 till October 15, 2010 at the Baking-Room of Electrode Production was performed lining of 2 shroud roofs of chambers Nos. 5 and 6 of the newly built baking oven No. 5. Hot face of the chamber shroud roofs was lined with PrismoBlock ZA 160 kg/m3 (300*300*610). The total lining area of 2 chamber shroud roofs is 100 m2. On 22 roofs were installed 110 burner blocks BIK. Currently the roofs and burner blocks are in operation.

Other projects:

  • Nizhniy Tagil Iron and Steel Works (NTMK)

    Nizhniy Tagil Iron and Steel Works (NTMK)

  • CJSC Aksinia (Rostov)

    CJSC Aksinia (Rostov)

  • Magnitogorsk Iron and Steel Works (MMK)

    Magnitogorsk Iron and Steel Works (MMK)

  • Chusovoy Metallurgical Works (CMW)

    Chusovoy Metallurgical Works (CMW)

  • Taganrog Boiler-Making Works «Krasny Kotelshchik»

    Taganrog Boiler-Making Works «Krasny Kotelshchik»

  • Novosibirsk Electrode Plant

    Novosibirsk Electrode Plant

  • Nytvensky Metallurgical Works «NYTVA»

    Nytvensky Metallurgical Works «NYTVA»

Copyright © 2011 | Baramist, All rights reserved
Разработка сайта IDWORKING