Our projects: Metallurgy

Chusovoy Metallurgical Works (CMW)

Chusovoy Metallurgical Works (CMW)

During 2008-2009 at the duplex workshop was completed revamp of the bottom of the converter with capacity of 22 tons. Old conventional lining made of acid firebrick was replaced. During 2008-2009 at the open-hearth plant was completed revamp of tapping spouts including replacement of conventional lining made of fire clay brick with vibro-formed solid sections BIK.

Other projects:

  • Nizhniy Tagil Iron and Steel Works (NTMK)

    Nizhniy Tagil Iron and Steel Works (NTMK)

  • CJSC Aksinia (Rostov)

    CJSC Aksinia (Rostov)

  • Magnitogorsk Iron and Steel Works (MMK)

    Magnitogorsk Iron and Steel Works (MMK)

  • Chusovoy Metallurgical Works (CMW)

    Chusovoy Metallurgical Works (CMW)

  • Taganrog Boiler-Making Works «Krasny Kotelshchik»

    Taganrog Boiler-Making Works «Krasny Kotelshchik»

  • Novosibirsk Electrode Plant

    Novosibirsk Electrode Plant

  • Nytvensky Metallurgical Works «NYTVA»

    Nytvensky Metallurgical Works «NYTVA»

Copyright © 2011 | Baramist, All rights reserved
Разработка сайта IDWORKING