Our projects: Metallurgy

CJSC Aksinia (Rostov)

CJSC Aksinia (Rostov)

At the beginning of 2010 was completed modernization of the kiln ZPKV-12GT. Old lining was replaced with high temperature module insulation MKBMP Z. In the result of it the kiln was put into maximum operating mode at 13000С and was solved the problem of contamination of porcelain products. The warranty for the service life for this kiln lined with new materials is 5 years minimum.

Other projects:

  • Nizhniy Tagil Iron and Steel Works (NTMK)

    Nizhniy Tagil Iron and Steel Works (NTMK)

  • CJSC Aksinia (Rostov)

    CJSC Aksinia (Rostov)

  • Magnitogorsk Iron and Steel Works (MMK)

    Magnitogorsk Iron and Steel Works (MMK)

  • Chusovoy Metallurgical Works (CMW)

    Chusovoy Metallurgical Works (CMW)

  • Taganrog Boiler-Making Works «Krasny Kotelshchik»

    Taganrog Boiler-Making Works «Krasny Kotelshchik»

  • Novosibirsk Electrode Plant

    Novosibirsk Electrode Plant

  • Nytvensky Metallurgical Works «NYTVA»

    Nytvensky Metallurgical Works «NYTVA»

Copyright © 2011 | Baramist, All rights reserved
Разработка сайта IDWORKING