Our projects: Metallurgy

Nizhniy Tagil Iron and Steel Works (NTMK)

Nizhniy Tagil Iron and Steel Works (NTMK)

At the end of 2009 was conducted testing of modules MKVM-300. This material was used for lining of tundish preheaters at the oxygen-converter workshop. Since January 2012 till present tundish preheating stations have been operated using ceramic fiber modules MKVM-300 only. The service life of one preheater is 1.5 month.

Other projects:

  • Nizhniy Tagil Iron and Steel Works (NTMK)

    Nizhniy Tagil Iron and Steel Works (NTMK)

  • CJSC Aksinia (Rostov)

    CJSC Aksinia (Rostov)

  • Magnitogorsk Iron and Steel Works (MMK)

    Magnitogorsk Iron and Steel Works (MMK)

  • Chusovoy Metallurgical Works (CMW)

    Chusovoy Metallurgical Works (CMW)

  • Taganrog Boiler-Making Works «Krasny Kotelshchik»

    Taganrog Boiler-Making Works «Krasny Kotelshchik»

  • Novosibirsk Electrode Plant

    Novosibirsk Electrode Plant

  • Nytvensky Metallurgical Works «NYTVA»

    Nytvensky Metallurgical Works «NYTVA»

Copyright © 2011 | Baramist, All rights reserved
Разработка сайта IDWORKING