Our projects: Power generation

Reftinskaya GRES

Reftinskaya GRES

- Upheaval of Boiler PK-39 of Power Unit No. 2
- Upheaval of Boiler PK-39 of Power Unit No. 3
- Upgrade of lining and insulation KhRCh of the Boiler PK-57 of Power Unit No. 7
- Upgrade of lining and insulation KhV of the Boiler PK-39 of Power Unit No. 3
- Design of upgrade of lining and insulation KhV of the Boiler PK-39 of Power Unit No. 1
- Design of upgrade of lining and insulation KhV of the Boiler PK-39 of Power Unit No. 5
- Packing up the set of materials for upgrade of lining and insulation of the Boiler PK-39 of Power Unit 5

Other projects:

  • Surgutskaya GRES-1

    Surgutskaya GRES-1

  • Yaivinskaya GRES-1

    Yaivinskaya GRES-1

  • Reftinskaya GRES

    Reftinskaya GRES

  • Sredneuralskaya GRES

    Sredneuralskaya GRES

  • Nevinnomysskaya GRES

    Nevinnomysskaya GRES

  • Tobolskaya CHPP-1

    Tobolskaya CHPP-1

  • Chelyabinskaya  CHPP-2

    Chelyabinskaya CHPP-2

  • Shakhtinskaya GTPP

    Shakhtinskaya GTPP

  • EMAlliance

    EMAlliance

  • Rosenergoatom Concern unit - Beloyarsk NPP

    Rosenergoatom Concern unit - Beloyarsk NPP

  • Machine-Building Factory of Podolsk (ZIO)

    Machine-Building Factory of Podolsk (ZIO)

Copyright © 2011 | Baramist, All rights reserved
Разработка сайта IDWORKING