Our projects: Power generation

Surgutskaya GRES-1

Surgutskaya GRES-1

- Testing of RTIC materials on the Boiler TG-104 of Power Unit No. 2
- Based on testing were produced: the economic assessment, draft of engineering proposal and technical assignment for the use of RTIC materials
- Supply of insulation materials for upgrade of equipment and thermal insulation

Other projects:

  • Surgutskaya GRES-1

    Surgutskaya GRES-1

  • Yaivinskaya GRES-1

    Yaivinskaya GRES-1

  • Reftinskaya GRES

    Reftinskaya GRES

  • Sredneuralskaya GRES

    Sredneuralskaya GRES

  • Nevinnomysskaya GRES

    Nevinnomysskaya GRES

  • Tobolskaya CHPP-1

    Tobolskaya CHPP-1

  • Chelyabinskaya  CHPP-2

    Chelyabinskaya CHPP-2

  • Shakhtinskaya GTPP

    Shakhtinskaya GTPP

  • EMAlliance

    EMAlliance

  • Rosenergoatom Concern unit - Beloyarsk NPP

    Rosenergoatom Concern unit - Beloyarsk NPP

  • Machine-Building Factory of Podolsk (ZIO)

    Machine-Building Factory of Podolsk (ZIO)

Copyright © 2011 | Baramist, All rights reserved
Разработка сайта IDWORKING